The results

The new warehouse has instantly increased the storage space, meeting the client brief with a robust and durable warehouse solution. 

At a glance

Size:

15m x 25m on a 6m high leg

Location:

Middlesborough

Sector:

Manufacturing / Logistics

The Requirement

We were contacted to help a leading workplace equipment and PPE supplier with additional warehouse capacity due to their continued growth and expansion. The client required a robust temporary warehouse solution to provide around 350m2 or 4,000 sq. ft. of storage space on their large site.

The Solutions

We worked collaboratively with the client to develop a number of design and specification options for their warehouse requirements. This included advising the client on fit out options for bespoke warehouse racking.

We installed the warehouse onto an existing concrete pad. The installation was fast and efficient as no wet trades were involved. Our in-house team completed the installation in just five days. Due to the efficient installation process, there was zero downtime and business operations were not disrupted.

 

The large leg height (6m) allowed the client to maximise internal volume. The racking layout and space within the structure also allows for forklift movement to facilitate loading and unloading with ease. The anti-condensation membrane provides additional protection to stored products. A large manually operated sliding door and a pedestrian door was specified with emergency release bars internally to the pedestrian doors.

The specification

Walling:

Industrial steel

Frame:

Aluminium clear-span structure with 4 channel aluminium extrusion beam

Roof:

Insulated industrial PVC 650g /m2, non-flammable, fully tensioned 

Anti-condensation membrane

Doors:

4m X 5.5m manually operated sliding door and push bar pedestrian door

 

Guttering:

170mm UPVC with 110mm downpipes 

Lighting:

Bespoke array of LED high bay lighting (client installation)

Quality Standards:

BS6399

In addition to the temporary warehouse, we also installed a flexible storage canopy solution to provide additional storage space on their site.

Start your temporary building project today, contact us.

EXPLORE OUR OTHER TEMPORARY BUILDING PROJECTS

Engineered HGV Loading Canopy & Re-Working Structure

Manufacturing Giant Boosts Capacity With New Warehouse

Go to projects page