13m x 15m on a 3m high leg
Scotland
Manufacturing / Logistics
Our client, a world leading supplier of components for doors and windows, started their building design using our interactive configurator. They needed additional overflow storage capacity with forklift access at their site. The initial design concept was for a 10m x 20m x 3m structure with industrial steel sides.
The structure was built using a high-grade aluminium clear-span frame featuring four-channel extrusions (169mm x 97mm x 3mm). Designed and manufactured under CE certification and ISO-controlled conditions, the building was engineered to withstand a snow loading of 25 kg/m² and a wind loading: 28 m/s. due to the exposed, rural location in Scotland. To provide long-term durability, we installed T35 trapezoidal steel cladding panels to the sidewalls, the interior finish included a galvanised protective coating.
We worked with the Site Manager to minimise disruption by carefully planning deliveries. The site remained fully operational during the build, allowing “business as normal” for the client during the efficient , three day installation.
Industrial-grade steel T35 trapezoidal panels, polyester-coated exterior, galvanised interior
High-grade aluminium clear-span structure with 4-channel extrusions (169mm x 97mm x 3mm). CE-certified and ISO-manufactured
4.8m (W) x 3.5m (H) manually operated sliding door
160mm UPVC with 110mm downpipes
Secured with chemical fixings into an existing concrete base
Industrial PVC 650g /m2, non-flammable, tear resistant and fully tensioned
BS6399
25kg/m² snow load, 28mps wind load due to the buildings location in the Scottish Boarders
Monday – Friday 8am – 5pm I Urgent Enquires: Contact Form